Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first, limited to the area of Islington:

  • Safer Junctions - A1 Holloway Road (including Drayton Park junction)

    Created by Simon Still // 1 thread

    In the last three years, there were 61 collisions, with 71 casualties, 19 of which were people cycling and eight of which involved pedestrians. (Data available up until the end of November 2018).

    The scheme aims to address identified and perceived safety concerns at these junctions, as well as at George’s Road and the turning into the petrol filling station south of Palmer Place. The scheme will introduce new, signalised pedestrian crossings at the Drayton Park/Palmer Place junction, replace the zebra crossing at the junction of Liverpool Road with a signalised crossing and simplify all the existing staggered crossings to straight across crossings at the Hornsey Road/Hornsey Street junction.

    We consulted on a proposal that sought to deliver signalised pedestrian crossings at Drayton Park/Palmer Place and Liverpool Road in 2010. This was not taken ahead because of concerns raised during the consultation about the impact of the scheme on local roads arising from proposed banned turns. This consultation was also launched shortly after the recently opened Emirates stadium, the effects of which were felt to have an impact on the response to the consultation. When developing our new proposal we took this feedback into account and have now amended the scheme to address these concerns. The details can be found below.

    Our proposals

    We would like your views on the following proposals which aim to provide new signalised crossings and address identified safety concerns.

    We propose to provide new, signalised pedestrian crossings at the Holloway Road/Palmer Place/Drayton Park junction and the Holloway Road/Liverpool Road junction. The existing signalised pedestrian crossing outside the London Metropolitan University Clocktower building would move south and be brought into the new junction.

    We propose to simplify the Holloway Road/Hornsey Street/Hornsey Road junction. We would convert the existing staggered signalised pedestrian crossings to straight across crossings. We also propose to remove the small triangular pedestrian island and slip road into Hornsey Road to create more space for people walking, reduce the crossing distance and simplify traffic movements.

    To allow for the proposed crossing changes to be introduced, changes to some bus stops, loading bays and parking locations between Hornsey Street/Hornsey Road and Ronalds Road would be required.

    To provide the new crossings, we propose to make changes to some permitted turning arrangements for traffic at the Drayton Park/Palmer Place and Liverpool Road junctions. All movements through the area would still be possible in the new road layout, but it might be necessary for road users to take a different route. These changes are necessary to allow the crossings to be delivered without displacing traffic on to local roads.

    In detail:

    • From Palmer Place on to Holloway Road, we propose to reinstate the right turn and remove the left turn. Traffic approaching from Palmer Place and heading north would instead use Liverpool Road to turn left on to Holloway Road
    • From Holloway Road in to Palmer Place, the left turn would be removed and vehicles would use Liverpool Road to turn left
    • From Liverpool Road on to Holloway Road the right turn would be removed and vehicles would use Palmer Place to travel south towards Central London

    We need to remove two trees to ensure the new signals at Liverpool Road are visible to drivers. We have identified locations to plant new trees elsewhere within the scheme extents, subject to ground conditions.

    We propose to change the traffic signals at the Drayton Park/Palmer Place junction so that the side roads run separately to reduce the risk of conflict between road users at this junction.

    To provide the new pedestrian crossings at the Drayton Park/Palmer Place junction and on Liverpool Road, all the junctions in the scheme must be addressed together. This is to ensure the road network operates effectively in this area for all users.

    Traffic modelling

    Our traffic modelling data shows that the overall effect of our proposals on buses is generally neutral. The majority of bus routes will experience a change in journey time of between 0 and 30 seconds, however there are also some considerable improvements, of up to 5 minutes, expected for buses using Liverpool Road in both directions, particularly during the PM peak. There is an overall small impact on northbound general traffic, with improved journey times for southbound general traffic. These impacts result from the need to balance the network for all vehicular modes affected by the proposals.

    Bus service changes

    As a result of changes to the turning movements at the junction of Palmer Place to Holloway Road, we are also proposing to reroute the 153 bus route in a northbound direction from Palmer Place on to Liverpool Road. This is required because of the changes at the Palmer Place junction but is also expected to increase reliability and simplicity for passengers.

    Cycleway consultation

    The London Borough of Islington, in partnership with Transport for London, are also currently consulting on a new Cycleway adjacent to this scheme. The new Cycleway will connect Finsbury Park and Highbury Fields, where the improved route will help cyclists cross Holloway Road at the existing cycle crossing at Fieldway Crescent. More details are available at: www.islington.gov.uk/highburycycleway.

    Please sign in to vote.
  • St. Peter & St. Paul Catholic Primary School Street Consultation

    Compton Street (from Agdon Street to Goswell Road) and Cyrus Street - School Street Scheme

    St. Peter & St. Paul Catholic Primary School

    Islington Council is planning to introduce a School Street Scheme to improve air quality around St. Peter & St. Paul Catholic Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.


    What is a School Street Scheme?

    A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.

    What is proposed for Compton Street and Cyrus Street?

    The proposal is to trial a temporary road closure on Compton Street (from Agdon Street to Goswell Road) and Cyrus Street into a School Street Scheme between 8.30am to 9.15am plus 2.45pm to 3.45pm during school term time.
    Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.

    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.

    Please sign in to vote.
  • Moreland Primary School Street Consultation

    Moreland Street, Pickard Street and Gard Street - School Street Scheme Moreland Primary School

    Islington Council is planning to introduce a School Street Scheme to improve air quality around Moreland Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.

    What is a School Street Scheme?

    A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.


    What is proposed for Moreland Street, Pickard Street and Gard Street?

    The proposal is to trial a temporary road closure on Moreland Street, Pickard Street and Gard Street between 8.30am to 9.15am plus 3.00pm to 4.00pm during school term time.

    Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.

    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice. 

    Please sign in to vote.
  • Hanover Primary School Streets Consultation

    Noel Road (from Danbury Street to St Peter’s Street) - School Street Scheme
    Hanover Primary School

    Islington Council is planning to introduce a School Street Scheme to improve air quality around Hanover
    Primary School and create a safer, more pleasant environment for everyone. The Council would like to
    hear your thoughts on the proposal.

    What is a School Street Scheme?
    A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and
    cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools
    this will help to reduce congestion and pollution at the school gates as well as make it easier and safer
    for children to get to and from school.


    What is proposed for Noel Road?
    The proposal is to trial a temporary road closure on Noel Road (from Danbury Street to St Peter’s
    Street) between 8.30am to 9.15am plus 3.15pm to 4.00pm during school term time.

    Vehicles will not be able to enter the streets between these times unless they have been given an
    exemption. Residents and businesses who live and work on a school street will be able to register for
    an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at
    weekends.

    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered
    vehicles entering the street during the times of operation may be identified by camera and issued a
    penalty charge notice.

    Hanover Primary School is being looked at as part of the wider School Street Scheme Programme
    across the borough. An 18 month trial is proposed. The Council will be working with the school and local
    community to develop the scheme.

    Please sign in to vote.
  • Finsbury Park to Highbury Fields Cycleway (QW10)

    Created by grahamparks // 1 thread

    We are now consulting on the Finsbury Park to Highbury Fields part of a future Cycleway between Farringdon and Palmers Green which has been developed in partnership with Transport for London. This new Cycleway route has been chosen because it is already very popular with cyclists and the numbers of people using this route are likely to increase.

    Our scheme would create a greener, more pleasant space for local people and a convenient, safer and more direct cycle route for cyclists of all abilities. The proposals have been designed to improve safety and comfort for cyclists and pedestrians by reducing conflict with motorised traffic.
    The improvements include fully protected cycle tracks, greening measures, widened footways, safer junctions, pedestrian crossing points and new signs/ road markings. All of these are designed to make cycling and walking easier, safer and more enjoyable.

    This route would link to other Cycleways in the London cycling network, including a complimentary signed route to the recent improvements at Highbury Corner, and make it easier for local people of all ages to cycle and walk to local facilities such as leisure centres and shops.

    The wider cycle lanes will allow people with adapted cycles such as cargo bikes or cycles for disabled people to use the route more easily and make it safer for all vulnerable road users in line with the Vision Zero agenda, which aims to eliminate all deaths and serious injuries from our roads.
    What are Cycleways?

    Cycleways are continuous, clearly signed and convenient cycle routes which bring together all of the high-quality routes into a single London-wide network that is easy for everyone to understand and use.

    ProposalsDetailed maps are available at the bottom of the page.
    1. Blackstock Road/ Ambler Road Junction: Traffic lights would be introduced at the junction with new pedestrian crossings, providing early release for cyclists and cycle boxes on all arms. This design will significantly improve conditions for pedestrian and cyclists crossing Blackstock Road and allow cyclists to continue on the Cycleway route towards Finsbury Park. This proposal will involve the removal of a parking space on Somerfield Road and the Electric Vehicle charging point along Ambler Road would need to be relocated. The section towards Finsbury Park will be consulted on separately by Hackney Council. (see map section 1)

    2. Gillespie Road/ Avenell Road Junction: Priority at the junction would be reversed so that vehicles on Gillespie Road would give-way to vehicles on Avenell Road. This design would also raise the carriageway to footway level which would make it easier for crossing pedestrians and cyclists using the Cycleway to turn into Gillespie Road. (see map section 2)

    3. Gillespie Road Trial Arrangement: The ongoing trial point no-entry preventing traffic travelling westbound on Gillespie Road past the junction with St Thomas’s Road, is not being formally consulted on as part of the Cycleway proposals but we welcome feedback. (see map section 5)

    4. Drayton Park/ Aubert Park Junction: The existing mini-roundabout at the junction would be removed and changed to a priority (give-way) junction. The carriageway will be raised to footway level with pedestrian crossing points on all sides of the junction. This will raise awareness of the new Cycleway route and also make it easier for pedestrians to cross the road. The junction would prioritise movements on Drayton Park and traffic along Aubert Park would give-way. (see map section 3)

    5. Martineau Road – Aubert Park: Fully protected cycle facility at least 2.2m would be provided for northbound cycles between Martineau Road and Aubert Park. The proposal allows for southbound cyclists to mix comfortably with general traffic by adopting a position in the centre of the traffic lane, making them more visible to other traffic. The proposed design will maintain the existing number of parking spaces, however some parking bays would be relocated elsewhere between Martineau Road and Aubert Park to make room for improved cycle facilities. For the purposes of consultation, two design options for protecting cyclists are being considered, which we would like you to comment on. Examples are given below to illustrate the different design options. (see map section 3)

    • Kerb protected cycle tracks: the cycle track would be at the same level as the carriageway with a kerb installed to separate vehicles and cyclists. See below example from Cycle Superhighway 2 between Stratford and Aldgate.

    • Stepped cycle tracks: The cycleway would be installed halfway between the carriageway and footway. See below example from Midland Road in LB Camden.

    6. Benwell Road – Martineau Road: Fully protected cycle facilities would be introduced in both directions on this section of Drayton Park. The cycle tracks would be at least 2m wide in each direction and will also include a small strip that will physically protect cyclists from parked vehicles. The proposed design will maintain the existing number of parking spaces and access arrangements along Drayton Park. Existing zebra crossings will be raised to footway level improving pedestrian accessibility and safety. (see map section 3,4)

    7. Benwell Road/ Drayton Park Junction: The existing junction would be converted to a ‘continental-style’ roundabout which would include protected cycle facilities throughout the junction and new cycle crossings on all arms of the junction. The design will also significantly improve conditions for pedestrians by introducing new zebra crossings on all arms, raised surface and widened footways reducing crossing distances. (see map section 5)

    8. Highbury Crescent Signed Route: A complimentary signed route is proposed to connect up to the recent improvements at Highbury Corner. (see map section 6)

    Please sign in to vote.
  • Safe speeds for central London – introducing 20mph speed limits

    Created by Sean Howes // 1 thread

    Overview

    We want your views on our proposals to make the streets we manage in central London 20mph by 2020 and the associated measures.

    Last year, in partnership with the Metropolitan Police Service (MPS), we published the Vision Zero Action Plan. The Action Plan sets out our ambition to eliminate death and serious injury from London’s transport network by 2041.

    It details our plans to reduce road danger, including proposals to implement a 20mph speed limit on the roads we operate and manage in central London. 

    We’ve been working to determine the most effective way of implementing the new speed limits and are now ready to share our plans with you.

    We’ve provided more information about our proposals on this page and would like your feedback before we progress this important safety programme.

    Please sign in to vote.
  • Hatton Garden cycle permeability schemes: St Cross Street and Saffron Street

    Created by Jean Dollimore // 1 thread

    St Cross Street

    St Cross street runs from Farringdon Road, across Saffron Hill to Hatton Garden. It is currently one-way westbound between Saffron Hill to Hatton Garden.

    The consultation proposes two-way cycling all the way through while reducing the short section between Saffron Hill and Farringdon Road to one-way eastbound for motor vehicles (with a cycle contraflow lane).

    Saffron Street

    Saffron Street connects Saffron Hill with Farringdon Road and currently the western end (as far as Onslow Street) is one-way eastbound.

    The consultation proposes two-way cycling all the way through while Saffron St is closed to motor traffic between Saffron Hill and Onslow Street in order to safely facilitate two-way cycling, and to create an improved environment for pedestrians.

    Please sign in to vote.
  • Winton Primary School Streets Consultation

    Islington Council is planning to introduce a School Street Scheme and left turn ban to improve air quality around Winton Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.

    What is proposed for Killick Street and Collier Street? The proposal is to trial a temporary road closure on Killick Street, between Southern Street and Collier Street, and Collier Street, between Killick Street and Calshot Street, between 8.30am-9.15am and 3.15pm-4.00pm during school term time. A no left turn will also operate on Southern Street during those times.

    Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.


    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.

    Please sign in to vote.
  • Hugh Myddelton School Streets Consultation

    Islington Council is planning to introduce a School Street Scheme to improve air quality around Hugh Myddelton Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.

    What is proposed for Garnault Place, Myddelton Street, Gloucester Way, Whiskin Street and Meredith Street? The proposal is to trial a temporary road closure on Garnault Place, Myddelton Street, Gloucester Way, Whiskin Street and Meredith Street, between 8.20am-9.15am and 3.00pm-3.45pm during school term time.
    Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.
    Signs will inform drivers of the restrictions before the entrance to the closed streets. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.

    Please sign in to vote.
  • Camden - Tottenham Hale cycle route

    At approximately 12km, this route would connect the town centres of Tottenham Hale, Seven Sisters and the Nag's Head, making it easier for people to make local journeys and use local services. The route would use both main roads and quieter back streets.

    Please sign in to vote.
  • Balls Pond Road Cycle Superhighway 1

    Created by Simon Munk // 1 thread

    Hackney council says:

    Hackney Council is working with Islington
    Council and Transport for London (TfL) to make
    improvements to the Cycle Superhighway Route
    1 (CS1) on Balls Pond Road.

    In February 2015 TfL in partnership with
    Hackney Council consulted on the CS1 route
    which included two options for Balls Pond Road:
    an option for advisory cycle lanes on each
    side of the road and an option for a two-way
    segregated cycle track. A positive response to
    the consultation was received showing overall
    support for the segregated two-way cycle track
    along Balls Pond Road.

    In autumn 2015 a second consultation was
    held by TfL in partnership with Hackney Council
    on a motor traffic reduction scheme in the De
    Beauvoir area to assist users of the CS1 route.
    We are now seeking your views on measures
    required to implement the segregated two-way
    cycle track along Balls Pond Road between the
    junctions of Culford Road and Kingsbury Road.
    These measures would complete the route, safely
    connecting the two halves of the CS1.

    Please sign in to vote.
  • Rotherfield School Streets Consultation

    Islington Council is planning to introduce a School Street Scheme to improve air quality around
    Rotherfield Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.

    The proposal is to trial a temporary road closure on Elizabeth Avenue between New North Road and Rotherfield Street between 8.30am - 9.15am and 3.15pm - 4pm during school term time.

    Vehicles will not be able to enter the street between these times unless they have been given an
    exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.

    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.

    Please sign in to vote.
  • Duncombe School Streets Consultation

    Islington Council is planning to introduce a School Street Scheme to improve air quality around
    Duncombe Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.

    The proposal is to trial a temporary road closure on Sussex Way and Hatchard Road (between
    Marlborough Rd and Cornwallis Rd) between 8.30am-9.15am and 3.15pm-4pm during school term time.

    Vehicles will not be able to enter the street between these times unless they have been given an
    exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.

    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.

    Please sign in to vote.
  • Ambler School Streets Consultation

    Islington Council is planning to introduce a School Street Scheme to improve air quality around Ambler Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.

    The proposal is to trial a temporary road closure on Romilly Road (between Ambler Road and Monsell Road) between 8.30am - 9.15am and 3.15pm - 4pm during school term time.

    Vehicles will not be able to enter the street between these times unless they have been given an
    exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.

    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.

    Please sign in to vote.
  • Yerbury Road School Streets Consultation

    Islington Council is planning to introduce a School Street Scheme to improve air quality around Yerbury Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.

    The proposal is to trial a temporary road closure on sections of Tytherton Road, Yerbury Road and Foxham Road between 8.45am - 9.30am and 3.15pm - 4pm during school term time.

    Vehicles will not be able to enter the streets between these times unless they have been given an
    exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.

    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.

    Please sign in to vote.
  • Ashmount School Streets Consultation

    Islington Council is planning to introduce a School Street Scheme to improve air quality around Ashmount Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.

    The proposal is to trial a temporary road closure on Hornsey Rise Gardens between 8.30am - 9.15am and 3.15pm - 4pm during school term time.

    Vehicles will not be able to enter the street between these times unless they have been given an
    exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.

    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.

    Please sign in to vote.
  • Drayton Park School Streets Consultation

    Islington Council is planning to introduce a School Street Scheme to improve air quality around Drayton Park Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.

    The proposal is to trial a temporary road closure on Arvon Road, between Drayton Park and Witherington Road, between 8.30am - 9.15am and 3.15pm - 4pm during school term time.

    Vehicles will not be able to enter the street between these times unless they have been given an
    exemption. Residents and businesses who live and work on a school street will be able to register foran exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.

    Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.

    Please sign in to vote.
  • DfT Policy Paper - Inclusive Transport Strategy

    Created by Matthew // 1 thread

    https://www.gov.uk/government/publications/inclusive-transport-strategy

    Lots of interesting stuff about inclusive transport regarding trains, buses, cars, public realm, streets and yes a bit about cycling too. Quotes:

    Shared Space:

    8.11 While we consider CIHT and DPTAC’s recommendations and how to take them
    forward, we are requesting that local authorities pause any shared space schemes
    incorporating a level surface they are considering, and which are at the design stage.
    We are also temporarily suspending Local Transport Note 1/11. This pause will allow
    us to carry out research and produce updated guidance.

    Objectives regarding Cycling:

    • Update Local Transport Note 2/08, which sets out the Department’s guidance to
    local authorities on designing safe and inclusive infrastructure for cyclists, to take
    account of developments in cycling infrastructure since its publication in 2008 and
    the responses to the draft AAP consultation and publish a revised version by early
    2019;
    • By 2020, explore the feasibility of amending legislation to recognise the use of
    cycles as a mobility aid71 in order to increase the number of disabled people
    cycling.

    Please sign in to vote.
  • Duncan Street - School Street Scheme

    Created by Simon Still // 1 thread

    Islington Council is planning to introduce a School Street Scheme to improve air quality around St John Evangelist Catholic School. The Council would like to hear your thoughts on the proposal.

    Air quality refers to the air around us, how clean it is and how many pollutants (harmful chemicals or substances) it contains. The more pollutants the air contains the more air pollution there is and the worse the air quality is. Children are one of the groups particularly vulnerable to the impacts of air pollution.

    The Council is working on a number of projects to improve air quality in Islington. One of these is to implement a School Street Scheme across the borough. A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle only zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.

    The proposal is to trial a temporary road closure on Duncan Street, between Islington High Street and Duncan Terrace, between 8.30am - 9.30am and 3pm - 4pm during school term time. Vehicles will not be able to enter the street between these times unless they have been given an exemption.

    The consultation document is available to download at the bottom of this page.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Spinner Please wait…
Back to top